Integrity and reliability engineering for plant that has to keep running.
DaySpring Engineering applies materials science and reliability engineering to pressure equipment, piping, storage tanks, pipelines and rotating machinery. Our assessments follow recognised API and ASME practice, and every conclusion shows the data it rests on.
On this page: What we assess Services How an assessment runs
What we assess
Each assessment is carried out against a named reference document, so your team and your regulator can check the method.
| Asset | Our work | Reference document |
|---|---|---|
| Process piping | Inspection planning support, thickness data review, corrosion rate and remaining life calculation, and inspection interval review. | API 570 |
| Pressure equipment programmes | Risk-based inspection programme design, damage mechanism review, risk ranking and inspection plans. | API RP 580 |
| Storage tanks | Design and construction review, materials and weld records, and test and foundation records. | API Std 650 |
| Rotating equipment | Special-purpose coupling specification review, selection checks and failure investigation. | API Std 671 |
| Pipelines | In-line inspection data review, metal-loss assessment and remaining strength calculation. | ASME B31G and Modified B31G |
| Pressure vessels | Design-basis documents, materials selection, and inspection and test plans. | The design code named in your specification |
Engineering services
Mechanical integrity programmes
Equipment registers, inspection plans, records and performance measures for pressure systems and critical equipment.
Materials and corrosion
Materials selection and qualification, traceability records, corrosion assessment and protective coating evaluation.
Failure investigation
Root cause analysis of equipment and component failures using 5-Why, Ishikawa and fault tree methods, reported with the evidence.
Reliability engineering
Failure mode and effects analysis, criticality ranking and maintenance strategy input for critical equipment.
Inspection and test plans
Inspection and test plans and quality records for fabrication, construction and repair work.
Independent technical review
A second opinion on reliability studies, integrity assessments and engineering reports before you act on them.
Technical training
Short courses for operations and maintenance teams, including valve and equipment reliability.
Integrity and quality together
Working with DaySpring ISO, we align materials, inspection and supplier records with ISO 9001:2026, so one set of evidence serves the plant inspector and the auditor.
Where we work: oil and gas processing and downstream facilities, power and hydropower stations, cement and heavy manufacturing, and fabrication shops.
How an assessment runs
Scope and data request
We agree the equipment, the question to be answered and the records we need.
Records review
Design data, inspection history, thickness readings, repairs and operating conditions are checked for gaps.
Site walkdown
We verify the condition and configuration of the equipment against its records.
Assessment
Calculations and risk ranking are carried out to the reference document, with every assumption stated.
Report
Findings are ranked by risk, each with the data behind it and a recommended action.
Follow-up
We review completed actions and update the assessment when new inspection data arrives.
Scope of our reports
Our assessments support your integrity decisions. They do not replace statutory inspection or certification where the law or the governing code requires it.
Bring us an integrity question
Tell us the equipment, its service and the data you hold. We will reply with a scope and the records we need to see.